The Gantt Chart and Captions from the 4D app can be included in the HD Screenshot.

The Show Tasks/Graph checkbox places the Gantt char, or Graph, from the construction schedule into the HD Screenshot.

The Timeline and Graph radio buttons toggle whether the Gantt Chart or the Cost Graph is displayed in the screenshot.

The Gantt chart will display before taking the screenshot. when displayed the user can edit the gantt chart as though the 4D app were open.

The Show Date checkbox toggles whether the Date and Time Captions from 4D are displayed in the screenshot. They are displayed in the ussual location in the top center of the view.

The PvA Checkbox toggles whether the PvA view is enabled. If the PvA view is enabled it will also be shown in the screenshot. The PvA construction screenshot will stretch the gantt chart across both views showing each model on top of the gantt chart. resolution settings are specific to each view. In PvA the total width of the output will be double what is selected in the drop down menu.

If a construction animation is loaded into 4D the date in the construction schedule will affect object visibilty regardless of whether 4D elements are enabled in HD screenshot. Objects are only visible in HD screenshot if they are visible with respect to the construction schedule at the time in the construction schedule.