Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Tunnel Boring machine Part1Machine Part 1

The Type of DOFS

Name

Range

Rotation

Translation

Drill

R1

0-360°

Ladder

R2

0-360°

Ladder

T1

0-1 meters

Bolt

T2

0-2 meters

Bolt

T3

0-2 meters

Bolt

T4

0-2 meters

Bolt

T5

0-2 meters

Bolt

T6

0-2 meters

Bolt

T7

0-2 meters

Bolt

T8

0-2 meters

Bolt

T9

0-2 meters

Body Move

T10

0-500 meters

Ladder Move

T11

0-503 meters